CARBON NEUTRAL COMPANY

Seal Of Approval Carbon Neutral Company

NJORD LAW FIRM Denmark supports the following UN goals for sustainable development:

barcode Wasser und Sanitärversorgung für alle Nachhaltige und moderne Energie für alle Nachhaltiges Wirtschaftswachstum und menschenwürdige Arbeit für alle Bekämpfung des Klimawandels und seiner Auswirkungen

NJORD LAW FIRM Denmark

Participant ID: DK-1930-0115

Valid until: 15.01.2022

This certificate guarantees that the reported quantity of 384 tons CO2 has been calculated according to Greenhouse Gas Protocol Standard, scopes 1, 2 and 3. The resulting emissions have been saved in Gold Standard tested climate projects.

NJORD LAW FIRM Denmark has acquired shares (certificates) in climate protection projects corresponding to the calculated volume of CO2 and therefore plays a transparent part in the realisation of the projects. This ensures that the company compensates for its own CO2 emissions, and thus scales back the rise in global warming.

The projects have been certified, and the issue and closure of the certificates is registered transparently.

NJORD LAW FIRM Denmark is therefore a voluntary participant in emissions trading, and thus makes a contribution to maintaining a viable environment by reducing the emissions of greenhouse gases. The holder of this certificate makes a sustainable contribution to the commitment to tackle global warming.

Dipl.-Ing. Frank Huschka

NJORD LAW FIRM Denmark supporting climate protection projects:

Orange Suvaan Solar Photovoltaic Power Project in Maharashtra

India

Solar Energy for India

M/s Orange SuvaanEnergy Private Limited (OSEPL) is constructing a solar energy project in the village of Mhasaleim district of Dhule, Maharasthra, with a capacity of 100 MW (50 x 2 phases).

The aim of the project activity is to generate electrical energy through the operation of a photovoltaic solar power plant. The total installed capacity of the project activity is 100 MW.

The objective of the Project Activity is the generation of electrical energy using solar energy through the operation of photovoltaic solar panels.

The electricity generated by the project will be exported to the Indian power grid. The Project Activity will therefore displace a corresponding amount of electricity that would otherwise have been generated by the dominant fossil fuel based electricity grid.



Category          Standard           
Carbon       |      Gold Standard 5928

Akbuk Wind Power Plant

Turkey

Grid-connected electricity generation from renewable sources

The Akbük Wind Farm Project involves the development of 31.5 MW onshore wind farm in the region of Aydýn Province, Didim District in Turkey. 

An estimated 105 GWh/year will be produced by the project activity and delivered to the national grid.

PROJECT DEVELOPER    Ayen Enerji A. S.                                     
ANNUAL ESTIMATED CREDITS  67,570



Category          Standard           
Carbon       |      Gold Standard 436

Zorlu Enerji Wind project

Pakistan

The Zorlu 56.4 MW Wind Farm Project will contribute to local sustainable development in the project area by exerting the following effects:

Economic development: Pakistan is currently facing acute energy supply bottlenecks. The project activity is expected to generate an estimated amount of 159,010 MWh per year and will therefore contribute to a reduction in the number of black-outs and brown-outs experienced by other Pakistani grid users. This can help to improve the economic performance of other businesses connected to the grid and supports economic growth in Pakistan.

Social development: The project will offer job opportunities for local people during the construction phase and the operational period, thus creating income opportunities and contributing to a higher living standard in the region. 

Environmental development: By avoiding air pollution from fossil-fuel power plants and reducing greenhouse gas emissions significantly, the project has positive effects for the local environment and improves Pakistan’s climate balance. 

Technological development: The project activity is the first of its kind in Pakistan. By adopting foreign manufacturer wind turbines, the project initiates an important transfer of technical know-how to Pakistan, and can act as a pioneer in promoting the spread of this technology to other wind power projects in this country.